LPG Cylinder Inspection Zinc Coating Line
1. Main specification
This set of machine is exclusively designed to spray zinc on the surface during manufacturing LPG
cylinder.It is consisted by arc-spray zinc machine,spray gun-auto-mechanism,work piece-auto feed-auto charge sped shit-mechanism,spray chamber,exhaling device,electrical controller.
2. Technical Data
Total power required by arc spray machine |
15KVA×N |
Power required by exhaling device |
5.5KW |
Required of compressed air |
0.55-7MPa |
Diameter of zinc wire |
Φ2-Φ3mm |
Required voltage |
380V |
Max spraying rate |
about 90PCS per hour |
Consuming rate of zinc bar |
93KG |
3. LPG Cylinder Production Process
4. Company Introduction
Established in 1983, Taizhou Yuehai Manufacturing Co., Ltd is specialising in design, manufacturing, testing, assembly and commissioning of LPG Cylinder Production & Re-validation Line and LPG& LNG & Liquified Gas Storage Tanks.
With more than 30 years' development, LPG Cylinder production line manufactured by Taizhou Yuehai are not only sold well in China, but also exported to more than 20 countries, such as Egypt, Kenya, Uganda, Libya, the Sudan, Nigeria, Iran, The philippines, Vietnam, Malaysia, Indonesia, Bangladesh, Guatemala, Cuba, and so on.
Our value is to provide high- quality products to our demestic and overseas cleants.
Our business principle is to hour our contract and keep our promise.
5. Our Company
6. Our Service
<> Pre-sales Consulation
<> Factory visit available
<> Machines Deminstration
<> Reasonable configration
<> Fast delivery
<> On-site Installation and training
<> Help with trial production
<> Fast After-sales technical support
<> Fast spare parts delivery
<> Logo and colors of machine can be customized
7. Overseas Installations
8. Packing and Delivery
We need to know the following information before quotation:
<> Technical drawing of cylinders you plan to produce, if possible
<> Are you a newcomer in this line or you have had some machine in your workshop?
<> How many cylinders will you plan to produce per 8.5-hour shift?
If you have any questions, please feel free to contact us.